Landmark infrastructure projects completed over the years
| # | Project Name | Client / Main Contractor | Start Date | Contract No. | Category |
|---|---|---|---|---|---|
| 1 | Central-Wan Chai Bypass Tunnel (North Point Section) & Island Eastern Corridor Link | Chun Wo-CRGL-MBEC JV | Oct 2021 | HY2009/19 | Tunnel |
| 2 | 132KV Cable Support Crossing Ng Tung River | DCK JV | Apr 2021 | J014/1010/PT/S-072/0000 (SC/014) | Cable |
| 3 | Upgrading of Kwun Tong Preliminary Treatment Works | CHEVALIER-CPC JV | Jun 2020 | DE/2017/01 | Sewage |
| 4 | Rehabilitation of Trunk Sewers Works in Tuen Mun | Chun Wo Construction and Engineering | Apr 2023 | DC/2018/09 | Drainage |
| 5 | Install GRP Pipe Works in Airport Three Runway System | Gammon Construction LTD | Jul 2023 | AA3802 (Zone6) | Airport |
| 6 | Supply Labours and Tools for Penstocks Installation & T&C | Atal Engineering Ltd | Apr 2024 | AA3310 | Installation |
| 7 | Dismantled of Temporary Steel Bulkhead & Installation of Bar Screen | Gammon Construction LTD | Jul 2024 | AA3802 | Structural |

Participated in a major Hong Kong transport infrastructure project — the construction of the North Point Section of the Central-Wan Chai Bypass Tunnel and the Island Eastern Corridor Link. This project required large-scale tunnel construction in a densely populated urban environment, demanding advanced engineering techniques and rigorous construction management.

Responsible for the installation of 132KV high-voltage cable support crossing Ng Tung River. This project combined electrical and civil engineering techniques to ensure safe and efficient high-voltage cable crossing. The scope of work included replacing temporary CLP cable bridge steel components and installing additional protection facilities.

Participated in the upgrading of Kwun Tong Preliminary Treatment Works to enhance the facility's sewage treatment capacity. The scope of work included manhole diver inspections and terminal manhole steel cofferdam sealing — specialist diving operations.

Responsible for the rehabilitation of trunk sewer systems in the Tuen Mun area, ensuring proper sewage flow and management. The scope of work included manhole end sealing modification and reconnection of existing manholes with GRP pipes.

Installation of GRP pipes for the Hong Kong International Airport Three Runway System, providing essential piping infrastructure for the new runway system. This project is critical to the airport's expansion and operations.

Providing professional labour and tools supply services for penstocks installation and testing & commissioning works, ensuring the correct installation and proper operation of penstock systems.

Responsible for the dismantling of temporary steel bulkheads and the installation of bar screens. This specialist engineering work requires meticulous planning and precise execution to avoid damage to surrounding infrastructure.